Salient Feature
Project Overview:
- Project Name: Super Kabeli Khola A Hydropower Project
- Location: Shirijangha Rural Municipality, Ward No. 6, 7 & 8
- Type of Development: Run-of-the-river
Accessibility:
| S. No. | From | To | Distance | Remarks |
| 1 | Kathmandu | Charali | 470 Km | East-West Highway |
| 2 | Charali | Ganesh Chowk | 200 Km | Mechi Highway |
| 3 | Ganesh Chowk | Kabeli Khola Bridge (Tribeni Dovan) | 16 Km | Earthen road |
| 4 | Kabeli Khola Bridge (Tribeni Dovan) | Happu Khola | 17 Km | Seasonal road |
| 5 | Happu Khola | PH area | 27 km | Seasonal road |
| 6 | PH area | HW area | 6 km | Seasonal road |
Transmission Line:
- Length: 31.0 km from Powerhouse to Kabeli Substation (Amarpur)
- SKKAHPP Powerhouse to SKKCHPP LILO - 6 KM,
- SKKCHPP LILO to K3HPP LILO - 6 KM and
- K3HPP LILO to Amarpur-19 KM
- Connection: Nearest NEA’s 132 kV Kabeli Substation (Amarpur)
Hydrology:
- Catchment Area at Intake Site: 159.88 km2
- Flood Discharge: 262 m³/s (Q100 flow)
General Hydraulics:
- Gross Head: 192.00 m
- Net Head: 184.702 m
- Design Flow: 8.35 m³/s
- Capacity: 13.5 MW
Major Structures:
- Diversion Weir: Concrete Ogee shaped, 18 m long, 5.8 m high
- Settling Basin: Dufour type with 2 bays, 90% trap efficiency
- Headrace Pipe: MS steel (E350), 3334 m long, Internal Diameter 2.2m & Thickness 10mm to 12mm
- Penstock Pipe: MS steel (E350), 149.5 m long, Internal Diameter 2m & Thickness 12mm to 25mm
- Powerhouse: Surface, 28 m x 14 m x 22.15 m
Equipment:
- Turbines: Horizontal Francis, 2 units, each with 6.96 MW rated output and 92% efficiency
- Generators: Brushless synchronous, 2 units, 7.95 MVA rated capacity each, 750 RPM and 97% efficiency
- Transformers: Three-phase, 1 unit, 17.5 MVA capacity, 11/132 kV Voltage Ratio and 99% efficiency
Energy Output:
- Annual Energy: 80.34 GWh
- Dry Energy: 12.92 GWh
- Wet Energy: 67.42 GWh
Financial Parameters:
- Total Project Cost: NRs. 2,71,90,85,000.00 with IDC
- Cost per MW: NRs. 20,14,14,000.00
- NPV of Project at Cost of Capital: NRs. 464,539,000.00
- Project IRR: 11.61%
- Equity IRR: 14.83%
- DSCR In 12 Years Average: 1.53
- Simple Payback Period: 8.17 years
- Discounted Payback Period @ 9.5%: 15.77 rears